Kenya Coal Seam Gas Operation Receives Pipeline
By Pentair X-FlowPentair was awarded the contract to supply the high-pressure pipeline to transport water from QGC's coal seam gas operations at Kenya to Chinchilla Weir.
The water, collected as a byproduct of the coal seam gas extraction process, is treated using reverse osmosis technology at Kenya and stored on site. The pipeline is then required to transport the treated water to the weir to return excess flows to the water cycle.
Please download this free white paper to read more.