User Manual for Energy Rig
By WestechInstruction for installation 2/2 'Construction of scaffolding'.
- Mounting of lifting tower for ENERGY Rig™ - assemble two lift towers
- The lifting frame shown is assembled by LB 1200. (Length use on beams is not significant)
- The most important element in this manual is to mount the beams in the exact height
- The producers own tables to determine how close the beams should be placed, to achieve axial power requirement of four tons on the loaded standard