Share

Taken from the perspective of the challenging North Sea environment and the logistics and expectations of an FPSO reel hose application.

The case study examines operational requirements, options and installation, all within the demands of tight deadlines.
The process involved a review of the previous Single Closure Gall Thomson specification and which Gall Thomson MBC would best deliver maximum protection and operational commercial advantage for the future.

Double closure Gall Thomson Petal17 and PetalC are compared, and which option delivered the optimum solution for this specific operation is summarised.

This case study is a glimpse into the Gall Thomson process and can be found at https://www.gallthomson.com/en/resources/fpso-reel-petalc-anasuria-case-study