Share

Geoquip has completed a two month campaign, including Seabed PCPTs to 40 mbsf in water depths up to 270m, within the proposed budget and time schedule.

The investigation included over 200 test locations, a total 1400m of seabed CPT and over 1900m of borehole including downhole PCPT testing and piston sampling. In addition numerous Piston Cores, Vibro Cores and Box Cores were taken to complement the site investigation.