Versabar provided custom engineering and rigging to aid in the construction of new storage silos in the Port of Gulfport, Mississippi, US.
Versabar engineered an 8-bar rigging system to remove each of the 12 silo tops that had been used to form the 120ft-tall structures as the concrete was poured. Each silo top weighed an estimated 50,000lb.
Versabar rigging engineers are known for their expertise in managing lift projects of all sizes and scopes.
For more information, please contact Versabar.