A leading supplier of packages and systems for O&G, offshore wind farms, naval and marine industry is proud to announce the successful load test of the most capable ILTs available on the market for a topic and strategic project awarded directly by a major marine contractor such as Heerema Marine Contractors.

Subject: No.4 Internal Lifting Tools (ILT)

The F.lli Righini scope of work (SOW) includes design, detailed engineering, procurement, fabrication and testing for No. 4 Internal Lifting Tools to be operated on board of the Heerema construction and heavy lift vessels, to grab tubulars for installation and decommissioning of offshore platforms. The ILTs are hydraulically operated and modular to handle tubulars ranging from 60 inches to 96 inches.

The ILTs have been successfully tested at a vertical load of 4,400 metric tonnes (Mt), consequently certified for 4,000Mt load, and 1,000Mt transversal load.

Highlighting its skills in designing and manufacturing of mooring systems, riser pull-in systems, hydraulic friction clamps, pipe tensioners, pipe handling systems, umbilical handling systems, lifting tools, davit cranes and subsea special tools, takes the opportunity to thank Heerema Marine Contractors for the confidence in awarding this topic contract.