Last weekend, the 2nd of October, we finished the pull of an OD500 gas pipeline from the beach to a jetty. The pipeline will be connected to an FSRU (Floating Storage and Regasification Unit) which will be moved to the Jetty near the city of Paldiski.
The pipeline has been pulled with an intermittent linear winch with a capacity of 200t. The winch was installed onboard the ABEKO Server 2, which was also used for the dredging work.