Chuandongbei project is an onshore natural gas project developed by Chevron in collaboration with China National Petroleum Corporation.
The $6.4bn project involves the development of the Chuandongbei gas field located in the northeast of Sichuan Basin, bordering on Chongqing in the east, Shaanxi in the northeast, and Nanchong and Bazhong of Sichuan in the west.
Natural gas production from the first phase of the project was achieved on 26 January 2016, marking an important step towards China becoming a leading supplier of clean and affordable energy in the southwest region of the country.
Chevron is the operator of the 1,969km² Chuandongbei natural gas prospect, of which the Chuandongbei project covers approximately 800km². Unocal East China Sea, a wholly-owned subsidiary of Chevron, is the operator of the project with a 49% interest, while China National Petroleum Corporation holds a 51% participating interest.
The sour gas project is one of the biggest onshore gas projects to be developed by a foreign company in China in collaboration with a Chinese company.
Chuandongbei project background
Chevron signed a 30-year product sharing contract with China National Petroleum Corporation in December 2007, for the joint development of the Chuandongbei natural gas resources.
The project was launched in April 2008 and its first phase was approved by the China National Development and Reform Commission in October 2009, signalling the start of the development stage.
Reserves and production
The Chuandongbei block has proven reserves of 176 billion cubic metre (bcm) of natural gas and recoverable natural gas resources of 3 trillion cubic feet (tcf). The project has a design capacity of 558 million cubic feet (mcf) of natural gas a day.
Stage one of the project is estimated to have a capacity of 258mcf of natural gas a day. The field possesses dry gas, which has high hydrogen sulphide content (8%-17%).
The Chuandongbei gas field consists of eight blocks in six gas fields, 63 production wells and a production rate of 1.69bcm of natural gas a year.
Chuandongbei project development details
The Chuandongbei project covers the Sichuan province and the Chongqing municipality and includes the Luojiazhai, Gunziping, Tieshanpo and Dukouhe-Qilibei gas fields. The development plan includes the construction of two sour gas processing plants connected by a gas gathering system to the five natural gas fields.
The development will be carried out in three stages, with the first stage comprising the development of the Luojiazhai and Gunziping gas fields as well as the construction of the Xuanhan gas processing plant.
The second stage of development will include the Tieshanpo gas field and the construction of another gas processing plant. The final stage will involve the development of the Dukouhe and Qilibei gas fields.
The Luojiazhai gas field has a production capacity of 3bcm a year and a daily capacity of 9.8mcm. A 3bcm/y purification plant, a 400,000t/y sulphur process plant, a gas gathering station, and 29km long gas collecting pipelines have been completed as part of the stage one development.
Mechanical completion of the first phase was achieved in late 2014. The field’s production commenced with the start of the first train, while the remaining two trains expected to come online later in the year.
Key players involved
Senscient was awarded a contract to supply 268 ELDS with open path gas detection systems, which are a combination of toxic and flammable sensors that can detect sour gas leakages over long distances.