Royale Energy has received permissions to drill 30 wells at Ballinger Oil Field in Runnels County in Texas, three of which will be drilled soon at the Ellenberger formation in the northern parts of the US state.
Current production in the field comes from the Palo Pinto North formation with interval of oil production for the field currently is at 3,400ft which is a limestone having primary, secondary and fracture porosity zones.
The initiative is to boost the oil field’s production since it has only produced 350,000 barrels as compared to the projected 4.75 million barrels till date.
Initial field development has been unable to access the proven oil accumulation, as indicated by the existing well spacing points to a significant potential for infill drilling by either vertical or horizontal wells.
Ellenberger formation is the deepest target in the area at nearly 4,400ft.
Royale Energy will also attempt to derive more than six million barrels of oil and 7.6 BCF of gas from other other formations below the Palo Pinto North.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataThe sites to be explored include the Cross-cut sandstone at 3,500ft, the Upper Capps Fm, at 3,700ft, the Jennings Fm at 4,000ft and the Gardner Fm at 4,100ft.
All of these are either behind pipe in the existing wells or the firm has missed them while trying to penetrate across the area, the company said.