Ibhubesi is a conventional gas development located in shallow water in South Africa and is operated by Sunbird Energy (Ibhubesi). According to GlobalData, who tracks more than 34,000 active and developing oil and gas fields worldwide, Ibhubesi was discovered in 1981, lies in block Block 2A, with water depth of around 806 feet. Buy the profile here.
The project is currently in feed stage and is expected to start commercial production in 2025. The development cost is expected to be $1,411 m. The Ibhubesi conventional gas development will involve the drilling of approximately 14 wells and includes FPSO, subsea manifold, subsea tree, and tension leg platforms.
Field participation details
The field is owned by CEF (SOC) and Sunbird Energy (Ibhubesi).
Production from Ibhubesi
Production from the Ibhubesi conventional gas development project is expected to begin in 2025 and is forecast to peak in 2040, Based on economic assumptions, the production will continue until the field reaches its economic limit in 2050.
Contractors involved in the Ibhubesi conventional gas field
Some of the key contractors involved in the Ibhubesi project as follows.
Other Contractors: John Wood Group, Tetra Tech, MHA Petroleum Consultants, CCA Environmental and Linch-pin
For more details on the Ibhubesi Conventional Gas Field, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.