Zory 1 is a producing cbm field located onshore Poland and is operated by Gazkop 1. The field is located in block Zory 1.
Field participation details
The field is owned by Gazkop 1.
Production from Zory 1
The Zory 1 cbm field recovered 37.34% of its total recoverable reserves, with peak production in 2021. Based on economic assumptions, production will continue until the field reaches its economic limit in 2079.
Remaining recoverable reserves
The field is expected to recover 0.34 Mmboe, comprised of 2.03 bcf of natural gas reserves. Zory 1 cbm field reserves accounts 0.01% of total remaining reserves of producing cbm fields globally.
Methodology
Information on the field is sourced from GlobalData’s fields database that provides detailed information on all producing, announced and planned oil and gas fields globally. Not all companies mentioned in the article may be currently existing due to their merger or acquisition or business closure.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalData